Transmission line project mountain foundation terrain is complex, geological conditions are complex, traffic conditions are poor, there is an urgent need to study and design a new mountain foundation, the configuration of more reasonable foundation type, so it is necessary to carry out mountain micro pile foundation design, field tests and mechanical equipment miniaturization of key technology research, to solve the problem of engineering construction.
Our company gives a design scheme that is more in line with the latest needs, breaks through the key technology research of the assembly type and lightness of the drilling equipment, and the drilling equipment adopts the functional modular design, the single piece weight of the control function module does not exceed 2 tons, the functional module combination is fast, convenient and reliable, and the control system has the versatility of the control.